Day 1. 11 learners start the project in the Carpentry and Joinery Workshop at Tshwane North College: Mamelodi Campus. After planning

 Day1

and creating a timeline

Day1

we started the floor.

day 1

Keywords: Carpentry, Joinery, Mamelodi

Posted by charles | 0 comment(s)

September 22, 2006

Day 2. We board the floor with MDF and floor boards.

Day 2

Keywords: Carpentry, Joinery, Mamelodi

Posted by charles | 1 comment(s)

September 23, 2006

 Day 3. We finish the floor.

Day 3

Timber studs are ready

Day 3

Keywords: Carpentry, Joinery, Mamelodi

Posted by charles | 0 comment(s)

Day 4. We fix the timber frames and start putting down the metal track to create rooms and start putting in the metal studs.

Day 4

We plumb the corners and put in the rest of the metal studs.

Day 4

We start the boarding.

Day 4

 

Keywords: Carpentry, Joinery, Mamelodi

Posted by charles | 0 comment(s)

September 26, 2006

Day 5: Boarding.

Day5

We also start the ceiling joists.

Day6

Bring on the frames.

Day7

Posted by charles | 0 comment(s)

September 27, 2006

Day 6. We install a metal frame. (Bowing is caused by the camera.)

Day7

Use the plumb rule and prepare an opening for a timber lining.

Day7

Pop rivet a stud.

Day7

Fix corner beads.

Day7

Posted by charles | 0 comment(s)

September 28, 2006

Day 7. We finish the openings and then we apply fibre tape to the walls.

Day7

Posted by charles | 0 comment(s)